00%

2 FLOORS. 20 FLOORS. 100 FLOORS.

From 2 floors to 100. Inside or outside. Designed for uninterrupted readiness.

Different buildings. Different heights. One adaptable vertical parcel transportation concept. ParcelLift is conceived for buildings of different heights and architectural conditions, with internal and external installation approaches and battery-backup capability considered as part of its building-specific system configuration.

Photorealistic architectural visualisation of a contemporary 4-floor low-rise residential building conceived for vertical parcel transportation
LOW-RISE · 2–5 FLOORS

Low-rise building

Independent residences, villas and compact residential properties integrating discreet vertical parcel movement from ground intake to upper floors.

Architectural visualisation of a mid-rise residential building integrating ParcelLift within its vertical circulation
MID-RISE · 6–20 FLOORS

Mid-rise residential building

Contemporary apartment developments separating daily parcel deliveries from shared lobbies, staircases and passenger lifts.

Photorealistic architectural visualisation of a tall high-rise residential tower development
HIGH-RISE & TALL · 21–100 FLOORS

High-rise development

Tall residential, commercial and mixed-use towers where drive arrangement, shaft structure and power architecture are engineered specifically for building height.

Illustrative architectural concepts. Each project requires a building-specific assessment of structural arrangement, available space, travel height, access, mechanical configuration, power architecture and operating requirements.

POWER INTERRUPTION. A SYSTEM DESIGNED WITH BACKUP IN MIND.

Battery-backup capability for essential system functions and defined backup operations.

ParcelLift's power architecture can incorporate battery backup to support essential electronic controls, communication, status indication and defined emergency recovery functions during building power interruptions, subject to the selected drive and safety engineering configuration.

CONCEPTUAL POWER ARCHITECTURE

Distinction between normal building power and battery-backed essential system functions.

NORMAL POWER
Building supply → Drive & system controls

Stationary building electrical supply powers primary vertical drive, landing interfaces, and routine parcel transport operations.

BACKUP POWER
Battery system → Essential controls & backup functions

Supports selected electronic controls, communication, status indication, and defined recovery functions during power interruptions, subject to selected engineering configuration.

CHARGING
Dedicated charging → Monitoring & management

Battery health monitoring, charging management, and safe response protocols for low battery, charging faults, or building power loss.

Illustrative power architecture. Backup scope, charging strategy, and controlled emergency recovery capability are configured per building according to the approved drive and safety engineering design.

INTERNAL OR EXTERNAL INTEGRATION

Internal or external integration, configured around the building.

Both internal and external integration receive equal engineering consideration. The appropriate configuration depends on the building's structure, available space, access, façade, local conditions and project requirements.

Internal parcel lift integration within a contemporary residential building core
INTERNAL INTEGRATION

Internal Integration

Designed to be considered within the building's internal architecture.

Coordinate the vertical shaft, floor-level landing interfaces, structural openings and MEP provisions directly within the building's interior layout.

External parcel lift integration coordinated along a multi-storey residential façade
EXTERNAL INTEGRATION

External Integration

Designed to be considered as part of the building's external architecture.

Integrate the vertical enclosure and floor-level access points along the building façade or perimeter service zone, coordinated with the elevation and supporting structure.

Project Coordination Process

01

Register Your Building

Share building height, floor count and architectural drawings through our building assessment request.

02

Architectural & Integration Planning

Evaluate internal or external integration alongside structural arrangement, available space and access.

03

Engineering & Power Configuration

Align travel height, mechanical arrangement, shaft provisions and project-specific backup power architecture.

04

Project Proposal & Execution

Receive a project-specific technical and commercial proposal coordinated with your development schedule.

V4 Engineering Reference

Engineered as permanent building infrastructure.

Application Range
2 to 100 Floors
Configured around building height & structure
Shaft Planning Reference
1,000 × 1,000 mm
Clear internal shaft — V4 planning reference
Working V4 Carriage
560 × 560 × 500 mm
External · direct floor collection · no upper buffers
Power & Resilience
Backup Capable
24V DC electrical & control architecture where applicable (230V AC building feed)
V4 ARCHITECTURAL PLANNING REFERENCE — NOT A CONSTRUCTION DRAWING.PLAN VIEW · INDICATIVE
V4 CARRIAGE~560 mm EXT.(~500 mm INT.)CORRIDOR-FACING LANDING INTERFACE(STRUCTURAL OPENING DETERMINED PER PROJECT)1,000 mm CLEAR INTERNAL WIDTH1,000 mm CLEAR DEPTHRAIL ZONERAIL ZONE
Clear Internal Shaft
1,000 × 1,000 mm — V4 planning reference
Working Carriage Envelope
Approx. 560 × 560 × 500 mm (ext.) · 500 × 500 × 450 mm (int.)
Structural Opening Dimensions
Determined separately during structural coordination.
Overall Installation Footprint
Determined by actual rails, supports, brackets, landing interface, wall construction and access requirements.

ParcelLift V4 uses an indicative 1,000 × 1,000 mm clear internal shaft planning envelope. Final shaft dimensions, structural openings, guide-rail positions, landing interfaces and installation clearances are established through project-specific engineering and building assessment.

ParcelLift V4 uses an indicative 1,000 × 1,000 mm clear internal shaft planning envelope. Final shaft dimensions, structural openings, guide-rail positions, landing interfaces and installation clearances are established through project-specific engineering and building assessment.

ParcelLift

From 2 floors to 100 · Inside or outside · Battery-backup capable

Give every parcel its own way up.

ParcelLift. A separate vertical journey for parcels, designed around the building.