FOR DEVELOPERS & ARCHITECTS

Two Ways to Integrate ParcelLift. One Dedicated Parcel Infrastructure Solution.

Every building has its own architectural layout and structural characteristics. ParcelLift works with developers, architects and engineering teams to develop suitable internal or external building integration plans.

BUILDING HEIGHT FLEXIBILITY · 2 TO 100 FLOORS

A vertical parcel system for different building scales.

From compact two-floor properties to high-rise developments of up to 100 floors, ParcelLift is conceived as a configurable building-integrated parcel transportation system. Internal and external integration approaches can be considered according to the building's architecture and engineering requirements.

2–5 Floors

Low-rise

Compact independent residences, villas and boutique low-rise buildings seeking discreet vertical parcel movement from ground intake to upper floors.

6–20 Floors

Mid-rise

Contemporary apartment developments reducing routine delivery traffic across shared passenger lifts and residential corridors.

21–50 Floors

High-rise

Multi-storey residential, commercial and mixed-use towers coordinating dedicated vertical parcel movement with structural and MEP planning.

51–100 Floors

Tall buildings

Large-scale high-rise developments requiring project-specific drive, structural, shaft and power-architecture engineering.

Application categories for architectural planning. Each project requires a building-specific assessment of structural arrangement, available space, travel height, access, mechanical configuration, power architecture and operating requirements.

BRING PARCELLIFT INTO YOUR BUILDING

Your Building. Your Architecture. A ParcelLift Integration Plan.

Whether you are planning a new high-rise development or looking to introduce dedicated parcel infrastructure into an existing building, ParcelLift can be explored through internal and external integration approaches.

Our team works with developers, architects and engineering consultants to understand the building, evaluate available space and structural conditions, and develop a suitable project-specific integration proposal.

Every building is different. We work with your project team to determine how ParcelLift can be integrated into it.

Internal integration concept visualisation showing ParcelLift shaft integrated flush within a modern building lobby and corridor
Option 01 · Internal
INTERNAL CORE SECTION
FL 03FL 02FL 01LOBBYLANDINGINTAKE
Internal integration — concept visualisation
INTERNAL BUILDING INTEGRATION

Integrate ParcelLift Within the Building

We work with developers and architects to incorporate ParcelLift into the building's internal layout, coordinating shaft location, floor interfaces, structural provisions and MEP requirements.

Well Suited For
  • 1,000 × 1,000 mm clear internal shaft — V4 planning reference
  • Structural opening, rails, brackets & landing interface coordination
  • New residential and commercial high-rise developments
  • Projects where internal shaft space and maintenance access can be coordinated
External integration concept visualisation showing the ParcelLift High-Rise Access System alongside a building façade
Option 02 · External
EXTERNAL FAÇADE CONCEPT
EXISTINGTOWERACCESS →GROUNDEXT SHAFT
External integration — concept visualisation
EXTERNAL BUILDING INTEGRATION

Explore an External ParcelLift Structure

For buildings where ParcelLift can be installed as a dedicated external structure, we develop an integration plan around the building façade, structural support requirements, floor access and available site space.

Well Suited For
  • Built on the same V4 carriage & guide-rail planning basis
  • Total external structure, façade supports, brackets & foundation sized per building
  • Existing and occupied residential or commercial towers
  • Developments planned with dedicated exterior vertical risers

Our team assesses internal and external installation requirements with your project consultants and prepares a building-specific technical and commercial proposal.

POWER RESILIENCE

Designed with backup power capability.

ParcelLift's power architecture can incorporate battery backup to support essential controls, communication and defined emergency functions during building power interruptions. Backup capacity and operating capability are configured according to the project requirements and selected drive architecture.

PRACTICAL CONSIDERATIONS
  • Reduced dependence on uninterrupted building power for supported essential functions
  • Battery backup for essential electronic controls and communication
  • A defined strategy for safe system response during building power interruptions
  • Potential for controlled recovery operations, subject to the approved drive and safety architecture
CONCEPTUAL POWER ARCHITECTURE

Distinction between normal building power and battery-backed essential system functions.

NORMAL POWER
Building supply → Drive & system controls

Stationary building electrical supply powers primary vertical drive, landing interfaces, and routine parcel transport operations.

BACKUP POWER
Battery system → Essential controls & backup functions

Supports selected electronic controls, communication, status indication, and defined recovery functions during power interruptions, subject to selected engineering configuration.

CHARGING
Dedicated charging → Monitoring & management

Battery health monitoring, charging management, and safe response protocols for low battery, charging faults, or building power loss.

Illustrative power architecture. Backup scope, charging strategy, and controlled emergency recovery capability are configured per building according to the approved drive and safety engineering design.

BUILDING TYPOLOGIES

Built for Residential, Commercial & Mixed-Use High-Rises

Concept visualisation of ParcelLift V4 integrated into an apartment tower lobbyResidential

High-Rise Residential Buildings

Multi-storey residential towers managing continuous daily e-commerce, grocery, and quick-commerce deliveries independently of passenger elevators.

  • Dedicated vertical path for routine parcel deliveries
  • Controlled ground-level courier intake separate from residential corridors
  • Direct floor-level resident collection via OTP with no corridor storage lockers
Concept visualisation of ParcelLift V4 alongside passenger elevators in a commercial lobbyCommercial

Commercial Buildings

Office towers requiring controlled mailroom-to-floor parcel movement without issuing temporary visitor passes for routine courier drop-offs.

  • Separates routine parcel movement from tenant and visitor passenger lifts
  • Controlled ground-level intake coordinated with reception or security
  • Authenticated floor-level handover via dynamic OTP
Concept visualisation of ground loading intake station for a mixed-use buildingMixed-Use

Mixed-Use Developments

Urban mixed-use developments maintaining clear operational separation between ground-level retail/service activity and upper residential or office floors.

  • Physical separation between retail/service intake and upper-floor corridors
  • Keeps routine delivery personnel out of residential lift lobbies
  • Coordinated across podium and tower floor plates
DEVELOPER & ARCHITECT CONSIDERATIONS

Designed for Building Integration

ParcelLift is conceived as permanent building infrastructure rather than a standalone lobby locker. Early coordination with architectural, structural, and MEP teams is central to how the system is planned.

INT-01

Dedicated Shaft Planning

Early core allocation using the 1,000 × 1,000 mm clear internal shaft — V4 planning reference, aligned across served floors. Structural opening dimensions and overall installation footprint are coordinated separately per building.

INT-02

Floor Landing Interface

Corridor-facing interlocked landing door positioned flush with lobby finishes so corridor circulation and egress widths are respected.

INT-03

Structural Coordination

Guide-rail wall-anchoring provisions, shaft enclosure material (masonry, RCC, or fire-rated partition), and pit/headroom clearances reviewed with structural consultants.

INT-04

Electrical & Control Provisions

Dedicated building power feed stepped to a 24V DC electrical and control architecture where applicable, plus provisions for backup power and maintenance isolation.

INT-05

Security & Access Control

Controlled ground-level courier intake separated from residential corridors, with OTP-based resident collection at floor landings.

INT-06

Architectural & MEP Coordination

Coordinating shaft placement alongside elevator cores, service risers, fire compartmentation, and lobby reception workflows during schematic design.

Site-Specific Engineering:Final shaft dimensions, structural anchor loads, fire-rating details, and electrical provisions depend on building configuration, local codes, and engineering assessment.

Read Planning Guide →
V4 ARCHITECTURAL PLANNING REFERENCE — NOT A CONSTRUCTION DRAWING.PLAN VIEW · INDICATIVE
V4 CARRIAGE~560 mm EXT.(~500 mm INT.)CORRIDOR-FACING LANDING INTERFACE(STRUCTURAL OPENING DETERMINED PER PROJECT)1,000 mm CLEAR INTERNAL WIDTH1,000 mm CLEAR DEPTHRAIL ZONERAIL ZONE
Clear Internal Shaft
1,000 × 1,000 mm — V4 planning reference
Working Carriage Envelope
Approx. 560 × 560 × 500 mm (ext.) · 500 × 500 × 450 mm (int.)
Structural Opening Dimensions
Determined separately during structural coordination.
Overall Installation Footprint
Determined by actual rails, supports, brackets, landing interface, wall construction and access requirements.

ParcelLift V4 uses an indicative 1,000 × 1,000 mm clear internal shaft planning envelope. Final shaft dimensions, structural openings, guide-rail positions, landing interfaces and installation clearances are established through project-specific engineering and building assessment.

COMMERCIAL CUSTOMER JOURNEY · REGISTER → CONNECT → ASSESS → PROPOSE

From Building Registration to a Project-Specific Proposal

Both Internal and External Building Integration follow the same structured four-stage engagement — giving your project team clear technical and commercial visibility.

STAGE 01 · REGISTER

Register Your Building

Builders, developers, housing societies or authorised representatives register their project with building details, floors, towers, project stage, and integration interest.

STAGE 02 · CONNECT

Our Team Connects With You

After registration, our team connects directly with you to understand your building, project requirements, internal or external integration direction, available drawings, and relevant site conditions.

STAGE 03 · ASSESS

Building Assessment

Our team evaluates the architectural, structural, and MEP information provided — with a site visit where required:

  • Architectural: site plan, ground-floor & typical floor plans, sections, elevations, shaft, staircase & lobby layouts
  • Structural: structural grid, column & beam arrangements, support locations, attachment & foundation/ground-level conditions
  • Electrical & MEP: electrical supply, cable routing, controls & communication provisions, service access, fire & life-safety coordination
  • Site visit arranged where required — assessment depth scales to your building, stage, and available information
STAGE 04 · PROPOSE

Project-Specific Proposal

Following the assessment, ParcelLift submits a project-specific technical and commercial proposal covering:

  • Recommended internal or external integration arrangement
  • Architectural placement & shaft or external structure configuration
  • Floor interface arrangement & operational approach
  • Structural, electrical & MEP coordination requirements
  • Project scope, responsibilities & implementation plan
  • Commercial proposal, relevant drawings & supporting visualisations

Where the nature of a project requires it, a miniature model, physical representation, additional 3D visualisation, or project-specific engineering study may also be prepared as part of the proposal stage.

BUILDING ASSESSMENT INFORMATION

Information & Drawings Reviewed During Assessment

You do not need to prepare a separate ParcelLift engineering package to register. Share basic project details to begin — our team will guide you on the relevant drawings once we connect.

01

Architectural Information

  • —Site plan
  • —Ground-floor plan
  • —Typical floor plans
  • —Building sections & elevations
  • —Available shaft or service-space information
  • —Staircase and lobby layouts
02

Structural Information

  • —Structural grid
  • —Column and beam arrangements
  • —Potential support locations
  • —Building attachment considerations
  • —Foundation and ground-level conditions for external integration
03

Electrical & MEP Information

  • —Electrical supply information
  • —Cable routing
  • —Controls and communication provisions
  • —Service and maintenance access
  • —Relevant fire and life-safety coordination

Not all drawings are required at registration. Share what is currently available — our team will identify any additional drawings needed when we connect.

08  /  Developer Planning Tool

Building Parcel Demand Estimator

Estimate daily and peak-window parcel arrival volumes for your building to support early architectural and operational planning.

Building InputsAdjust parameters
202505001,000+
0.20.81.53.0
45%

Share of daily parcels arriving during peak hours.

4 hrs

Duration of the selected peak arrival window.

Estimated Building Demand
Estimated daily parcel demand
144parcels / day
Estimated peak-period parcel demand
65parcels in 4 hrs
Average incoming parcels / hour (peak)
16.3parcels / hour
Active Assumptions
180 apartments × 0.8 parcels/day
45% peak share across 4-hour window

These figures represent building-demand estimates, not guaranteed ParcelLift throughput. System sizing is calculated per building during engineering review.

Register → Connect → Assess → Propose

Bring ParcelLift Into Your Building

Register your building with ParcelLift. Our team will understand your project, review the available drawings and building requirements, assess the integration possibilities and prepare a project-specific proposal.